Blue Wren Creek

February 18, 2016

Bed controls Blue Wren Creek

Trevor led a project to rehabilitate 300m of the Blue Wren Creek. These photos before the work started show erosion, failed rock work and an infestation of weeds on the site.

Blue Wren Creek erosion

Blue Wren Creek weeds

Blue Wren Creek before

 

This project created seven rock bed control structures and one made of log, and plants were placed into a mulched area.

Bed controls at Blue Wren Creek

Blue Wren Creek after completion

 

The work received a strong test when large storms hit the area. These photos were taken two days after the extreme weather subsided and show the effectiveness and sturdiness of the new beds.

Bed controls Blue Wren Creek

Pool Riffle Blue Wren Creek

 

 

Cockle Creek

February 17, 2016

Cockle Creek

CiviLake carried out work at Cockle Creek in Teralba. Around 80m of the streambank was stabilised, with five rock fillets constructed and 2000 plants added to the area.

 

Cockle Creek bed

 

Cockle Creek before

 

Cockle Creek cattle

Cattle, who had been having an impact on the ground, were removed from the property soon after and revegetation was completed by Landcare.

Mulching at Cockle Creek

 

Cockle Creeks fillets upstream

 

Cockel Creek Filletes

Nine years later the bank has built back out and mangroves have flourished along that spot.

Cockle Creek inside bend

 

Cockle Creek restoration

 

Cockle Creek Mangroves

 

Marmong Creek

February 12, 2016

Marmong Creek

Trevor initiated, planned and co-ordinated the restoration of approximately 150m of Marmong Creek, transforming this reach of the waterway from an eroded and weed infested mess to a stable series of pools and riffles improving water quality and providing habitat for aquatic fauna. The project included the creation of bed control structures at Marmong Creek, Woodrising. The project included the installation of five bed controls, stabilisation on both sides of a 150m stretch along the steam and the introduction of 2000 new plants. Construction was completed by Soil Conservation Service.

These first two images show the condition of the creek before work began:

Before1_MarmongCreek_LM

Before2_Undercutting

The construction and planting took place in September and October, dramatically changing the look of the area.

After2_AllWorkCompleted_LM

Restoration at Marmong Creek

The ultimate test for the project came when the Lake Macquarie area was hit by huge storms. The following photos show how well the bed control and stabilisation work held up to the intense weather.

After4_April2015Floods_LM

After3_April2015Floods_LM